好湿好硬好痛视频_无码中文字幕视频魅影网_免费a级毛片18以上观看精品_国产精品自在拍在线播放

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.